Translate

Wednesday, July 18, 2012

Summer Updates

Good afternoon to all of you! It has been a long, yet great Summer. Between the heat, the lessons and the drought, I will never forget this Summer.

To bring everybody up to speed, here is a laundry list of updates to share with you: 

  1. If you are going to one of the upcoming Summer Shows, HoneyBee G2 will not be at Air Venture 2012/Oshkosh or the PRA Convention at Mentone.  If you were on the rides list, we will do what we can do to get you rescheduled for another time. 
  2. Paul Rogers Update: A review of the accident occurred on July 5, 2012. We too are waiting on a formal report to be released by those that were part of this process.  Thanks for your support.
  3. Based on the feedback from those that have ridden with me over the Spring and Summer, the 2PT Revision C Frames  have been given a 12" stretch to the passenger  area. 
  4. The Folding Mast works like a dream; 94" folded. Option will also be available on the SP-HP and MicroLight. 
We will have more updates coming to you soon. Thanks for tracking with us.


Take care,